Please update your Flash Player to view content.

Latest News

  • 2012 BRW Fast Starters

    BRW-Fast-Starters-2012O2 has been recognised as one of Australia’s 100 fastest growing start-up companies for 2012...

  • Winners at 2011 Business Awards

    Business_Awards_2011O2 are the proud winners of the Environmental Industries Large Business Award at the Sunshine Coast Excellence in Business...

O2 AWARDS

To see the full list of awards that O2 has won. Click here...

Newsletter Signup

:


Follow us on

O2 Environment + Engineering

Welcome to O2

O2 is a specialist environmental and engineering consultancy that focuses on management of water quality and quantity. We offer services in Erosion and Sediment Control (ESC), Hydrology and Hydraulics, Stormwater Management, Waterway Rehabilitation and Design and Water Sensitive Urban Design (WSUD) to the mining, development and infrastructure sectors.

O2 is a Queensland based consultancy with offices in Brisbane, Gladstone and the Sunshine Coast. Our team has worked throughout Australia and has completed a number of international projects in the U.K., Malaysia, Thailand, Brunei, Burma, Indonesia, Philippines, Fiji, Mauritius, Saudi Arabia, Mozambique, Jordan, Somalia and India.

 

Read more...

O2 Ecology opens its doors Email_logo

O2 Environment and Engineering is proud to introduce O2 Ecology, a new partner company. Similar to O2's passion for water, O2 Ecology will provide expert consulting assistance based on their passion for ecology.

Read more...

Latest Projects

image image image image image image image image
St Hilliers ESC Compliance O2 Environmental was commissioned by St Hilliers Construction to prepare an Erosion and Sediment Control Plan (ESCP) for the Defence Housing Australia (DHA) building site at Everton Park. The DHA site will feature 32 new two storey, three-bedroom houses with single or double garages.  This project is part of DHA's commitment to meeting the objectives of the Australian Government's Nation Building - Economic Stimulus Plan for 2010-2011.
NNA Northern Pipeline Interconnector O2 Environment + Engineering was commissioned to assist the Northern Network Alliance (NNA) with Erosion and Sediment Control services performed in connection with the Northern Pipeline Interconnector Stage 2. This included practical ESC training of staff and subcontractors (including certification), a review and update of ESC plans and documents, full time construction ESC supervision for on-ground direction, high level advice and review as required, consultation with contractors, and design of Sediment Basins and soil analysis as required.
DERM Deemed to Comply O2 drafted a new ‘deemed to comply’ guideline for low risk development and building sites in consultation with the Department of Environment and Resource Management (DERM) and the Erosion and Sediment Control Industry and Government Working Group.
Water Quality Monitoring, Viridian Noosa Resort Viridian Noosa requested O2 undertake on going monitoring and reporting to meet the requirements of the Environmental Management Plan (EMP) for the operational phase of the Development Approval for and development of the Resort.    Water Quality Monitoring shall be undertaken on a three monthly campaign and monitoring of surface waters shall be conducted in accordance with the approved Stormwater Management Plan.
Gladstone Regional Stormwater Quality Management Plan
O2 has been contracted by the Gladstone Regional Council to provide the Consultancy Services for the Gladstone Regional Urban Stormwater Quality Management Plan (GRUSQMP).  O2 Director, David Sargent will act as Project Manager and Principal Engineer/Hydrologist for the 12 month study. Also involved are key O2 personnel including Senior Water Resource Engineers Emma Jarrold, Kyle Robson, Steven Chamberlain  and Water Quality and Waterway Assessment Specialist Steve Dudgeon
Gladstone Port Erosion and Sediment Control O2 has recently been commissioned by Abigroup to undertake a Soil and Water Management Plan and staged Erosion and Sediment Control Plan for the haul road and quarry associated with the construction of the Fishermans Landing 153 Bund, in the port of Gladstone. The proponent for the project, Gladstone Ports Corporation (GPC), proposes the $82.5 million northern expansion of the existing Fisherman’s Landing facility at the Port of Gladstone through the reclamation of approximately 170 hectares adjacent to the existing port facility. The reclamation will provide an additional 153 ha (approximately) for the port. Fisherman’s Landing is situated 10 kilometres north of Gladstone. .
Narrows Crossing Pipeline Assessment - QGC O2 was required to assess the potential erosion and sedimentation impacts associated with the construction of the Narrows Crossing pipeline and the LNG facilities on Curtis Island. O2 was responsible for preparing strategies and plans for the management and monitoring of all identified erosion and sedimentation impacts. These plans were also suitable for incorporation into the project site Environmental Management Plans for the construction and operational phases of the project.     .   
ESC - Curragh and Curragh North Mines O2 was commissioned by Wesfarmers Curragh Pty Ltd to undertake assessment of the quantity, quality and suitability of existing water storages to capture and detain water resulting from various rainfall intensity events at their Curragh and Curragh North mining projects. 

Our Clients

Trackstar-alliance


HWW

Queensland_Gas_Co

Northern-Network-alliance
RCC
Leighton
SRWPA
Abigroup
P-E

JFP

watpac
wesfarmers_curragh

IPWEA

Gladstone-City-Council
Seymour-Group
CCF

FH

Hinze-Dam
Ipswich_City_Council
Powerlink
Viridian
Logan-City-Council
BMA
Qld-Transport
ETS_group